The Panama Canal does not use dams as locks, and the two do different jobs: locks are the water lifts that raise and lower ships, while dams are the structures that hold back the lakes the locks draw their water from. The original canal has three lock sites, Gatun on the Atlantic side and Pedro Miguel and Miraflores on the Pacific side, and the 2016 expansion added a second, larger set of locks at Cocoli on the Pacific side and Agua Clara on the Atlantic side. Gatun Dam holds back Gatun Lake, the canal’s main water source, and Madden Dam holds back Alajuela Lake, the secondary reservoir. JetBlack cannot arrange a Panama Canal transit; this page answers the question as written.

The original locks, and what each one does
Gatun Locks are a three-step flight that lifts ships 85 feet between the Atlantic and Gatun Lake. Miraflores Locks are a two-step flight with a lift that varies with the Pacific tide, roughly 43 to 64.5 feet, and Pedro Miguel Locks are a single step of about 31 feet. Together Miraflores and Pedro Miguel lift a ship from the Pacific to Gatun Lake level, and Gatun lowers it to the Atlantic, or the reverse. The original chambers are about 1,000 feet long by 110 feet wide, which set the Panamax size limit: ships up to about 294 metres long and 32.3 metres wide. Electric locomotives called mules guide ships through the original locks, and the lock water flows by gravity from Gatun Lake.
The new locks, and the dams behind them
The Neopanamax locks opened on June 26, 2016, with chambers about 1,400 feet long by 180 feet wide, rolling gates instead of miter gates, tugboats instead of mules, and water-saving basins that reuse about 60% of the water used in a transit. They take ships up to about 366 metres long and 51 metres wide, roughly 14,000 containers against about 5,000 through the original locks. The dams are a separate story: Gatun Dam, an earth dam across the Chagres River, created Gatun Lake, and Madden Dam created Alajuela Lake, which feeds the canal in dry periods. Without those lakes there would be no water to fill the locks, and in drought years the canal limits ship draft precisely because lake levels fall.
How long a transit takes
A transit itself takes about 8 to 10 hours, and total time in canal waters is often longer because ships wait at anchor for their scheduled slot and must take on a Panama Canal pilot, who controls the ship for the transit. Cruise ships often do a partial transit, entering through Gatun or Agua Clara locks into Gatun Lake and returning the same way, which is a different trip from a full ocean-to-ocean crossing.
Book Your New York Ride With the Price in Writing
Related JetBlack pages, all checked live for this build: book a New York car service · a JFK to Sheepshead Bay car service guide · child seats in a New York car service · wheelchair-accessible vehicles in New York · a JFK to Brewster Hill stretch limo route · a JFK to Brooklyn Heights stretch limo route · a JFK to Bushwick stretch limo route · JetBlack Transportation.
What are the differences between the Panama Canal locks and dams?
Locks lift and lower ships; dams hold back the lakes that supply the lock water. Gatun, Pedro Miguel, and Miraflores are the original locks, Cocoli and Agua Clara are the 2016 Neopanamax locks, and Gatun Dam and Madden Dam hold back Gatun Lake and Alajuela Lake.
How big are the original and new Panama Canal locks?
Original chambers are about 1,000 feet by 110 feet, setting the Panamax limit of about 294 metres by 32.3 metres. Neopanamax chambers are about 1,400 feet by 180 feet, taking ships up to about 366 metres by 51 metres.
How long does a Panama Canal transit take?
About 8 to 10 hours for the transit itself, longer including waiting for a slot, with a Panama Canal pilot aboard throughout.
Sources: Panama Canal Authority lock and expansion information and canal engineering references, checked 2026-10-29; dimensions and lifts are as published for the original and Neopanamax locks.